Sign in Subscribe

Zoning Board tables battery storage variance pending safety review

Zoning Board of Appeals · Meeting of March 9, 2026

NY WHEATFIELD — Wheatfield Zoning Board tables battery storage variance citing fire safety gaps. Syncarpha CF II, LLC sought variances to build a five-megawatt battery energy storage system on Liberty Drive against town limits of one megawatt and 500-foot setbacks; the applicant requested setbacks as low as ten feet. Fire Advisory Board Chairman Marc Kasprzak raised concerns about thermal runaway containment, fire spread between battery containers, and isolation distance standards.

The Frontier Fire Department opposes the proposal. The board unanimously voted to table the request, directing the applicant to address safety concerns before resubmission.

In the full story:

  • The complete report — 304 words

Source: the Zoning Board of Appeals meeting of March 9, 2026, reported from the official video recording and transcript.

Keep reading with a 14-day free trial

Subscribe to The Wheatfield NY Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Wheatfield NY Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe